26
Active Initiatives
7
Ranked Bets
3
At Risk
9
Cross-Domain
5
Shipped this Q
Efficiency Gains 10 Revenue Growth 10 Cost Reduction 3 Risk Mitigation 1 Compliance 1 Unthemed 1
🎯 Ranked Bets 7
Explicitly prioritised — the quarter's committed investments
1
PM-541

One CRM Project

Efficiency Gains 🟢 Moving ⚡ Cross-Domain · 5 squads
At Risk
🎯 Value
OKR
Outperform Budget and create new EBITDA growth, Go live with "One CRM" by 6 March
Expected outcome
Implement a consolidated, enterprise-connected version of Zoho that enables & drives core buyer & vendor CRM processes. Allows us to measure key metrics, flexible for future growth (particularly with AI) & is efficient to support & maintain
🔄 Flow
In Progress Due 3 Apr 2026
23w
Running
21d
In stage
X-Large
Size
Squads
BuyerPAIRSPMOQAWT+4
Product
NCNicole Charlwood
Eng
MAMazharul Anwar
🏥 Health
At Risk
Active risk
Scope, Timeline
Show work breakdown 17 active 4 done 27 total · 9 squads
Buyer 8 epics · 7 active · 0 done
KeyEpicStatusAssignee
BUYER-3114 EPA Notes & Motor Dealer Number - Phase 1 In Progress
BUYER-3079 CRM Buyer Conversion In Progress Sandra Lucie
BUYER-3070 Update PAS Buyer Screens for CRM In Progress Sandra Lucie
BUYER-3069 Passthrough Buyer Data to Zoho (March) In Progress Sandra Lucie
BUYER-3068 Zoho Integration to PAS Buyer In Progress Sandra Lucie
BUYER-3103 Send My Pickles Sign-Up as leads to Zoho In Progress Sandra Lucie
BUYER-3066 Support buyer data migration for CRM In Progress Sriman Goshki
BUYER-3228 Motor Dealer Number - Phase 2 Not Started
QA 2 epics · 1 active · 0 done
KeyEpicStatusAssignee
QA-2277 OneCRM E2E Functional and Regression Testing In Progress
QA-2276 OneCrm Performance Testing Not Started Nalaka Gamage
Platform Ops 1 epic · 1 active · 0 done
KeyEpicStatusAssignee
POPS-2652 POPS Task for ONE CRM In Progress Anas Semesmieh
WT 2 epics · 2 active · 0 done
KeyEpicStatusAssignee
WT-6680 Update Website Forms / Links In Progress Sandra Lucie
WT-6426 Support My Pickles Sign-Up leads data migration for CRM In Progress
PAIRS 7 epics · 4 active · 3 done
KeyEpicStatusAssignee
PAIRS20-7685 Vendor Data Migration for OneCRM In Progress
PAIRS20-7681 Remove unused items from PAS Vendor In Progress
PAIRS20-7680 Receive data from Zoho In Progress
PAIRS20-7629 Update PAS Vendor Screens for CRM In Progress
PAIRS20-7684 Not Required - Update PAS VSA Screens for CRM Done
PAIRS20-7683 Not required - Receive agreement data from Zoho Done
PAIRS20-7682 Not Required - Send VSA summary to Zoho Done
PMO 4 epics · 2 active · 0 done
KeyEpicStatusAssignee
PM-568 One CRM - General Support (PO,CM,PM,DL,BA,Arch,UX) In Progress
PM-670 NFR- Non Functional Requirements In Review Shiva Ponnuraj
PM-747 OneCRM Test Analysis Not Started
PM-672 Chaos and Recovery Not Started
Experience Design 1 epic · 0 active · 0 done
KeyEpicStatusAssignee
XDX-1219 PM-541 One CRM Project Not Started
Asset Mgmt 1 epic · 0 active · 0 done
KeyEpicStatusAssignee
AM-12202 Asset work for One-CRM (Phase 2) Not Started Linda Fong
Data Eng 1 epic · 0 active · 1 done
KeyEpicStatusAssignee
DE-10595 CRM Data Migration - DW to Zoho Done Lennys Inojosa
1
PM-253

AI Initiatives

Cost Reduction 🟢 Moving ⚡ Cross-Domain · 4 squads
On Track
🎯 Value
OKR
Pickles to be AI first - Execute 100% of Phase 1 for the endorsed A1 plan
Expected outcome
Efficiency Gains in business (This include the Chatbot on the web)
🔄 Flow
In Progress
18w
Running
20d
In stage
Large
Size
Squads
AI ChatbotPlatform OpsInspectionsAsset Mgmt
Product
ASAhmed Shuja
Eng
ACAdrian Chew Kah Hoong
🏥 Health
On Track
No blockers reported
Show work breakdown 8 active 4 done 19 total · 4 squads
AI Chatbot 13 epics · 6 active · 1 done
KeyEpicStatusAssignee
AICHAT-67 Chatbot - Phase 1 BUGS In Progress
AICHAT-39 Chatbot - General Support and Info Sharing In Progress
AICHAT-35 Chatbot - Knowledge base In Progress Judy Schreiber
AICHAT-32 Chatbot - Core chat experience In Progress Judy Schreiber
AICHAT-25 Chatbot - Foundation work In Progress Judy Schreiber
AICHAT-3 Chatbot - RAG(Retrieval Augmented Generation) In Progress
AICHAT-102 Chatbot - CCC feedbacks Debts Not Started
AICHAT-100 Chatbot - Phase 1 Technical Debt Not Started
AICHAT-34 Chatbot - User feedback Not Started Judy Schreiber
AICHAT-36 Chatbot - Web Query Agent Not Started Judy Schreiber
AICHAT-37 Chatbot - Intent routing Not Started Judy Schreiber
AICHAT-38 Chatbot - Observability & evaluation Not Started Judy Schreiber
AICHAT-33 Chatbot - Safety & guardrails Done Judy Schreiber
Platform Ops 3 epics · 2 active · 1 done
KeyEpicStatusAssignee
POPS-2815 POPS - Chatbot - Infrastructure Setup In Progress Anas Semesmieh
POPS-2228 AI-First Initiative In Progress Jeimansinggam Jeyasingam
POPS-1718 AI Pilots - POPS Contributions - EPIC Placeholder Done Aulia Fajri
Inspections 2 epics · 0 active · 1 done
KeyEpicStatusAssignee
IN-1809 AI Initiatives - Inspections Not Started Lucinda Pagett
IN-967 [PInspect] Inspection AI Integration Done Mina Makhtar
Asset Mgmt 1 epic · 0 active · 1 done
KeyEpicStatusAssignee
AM-12273 AI-First-Initiatives Done
2
PM-749

CDP Phase 1

Revenue Growth 🟡 Ticking
On Track
🎯 Value
OKR
Deliver tech solutions to increase bidder engagement in end zone
Expected outcome
Modern technology stack that can evolve quickly to business needs
🔄 Flow
In Progress Due 30 June 2026
6w
Running
17d
In stage
Medium
Size
Squads
WT
Product
ASAhmed Shuja
Eng
SGSriman Goshki
🏥 Health
On Track
No blockers reported
Show work breakdown 1 active 0 done 1 total · 1 squad
WT 1 epic · 1 active · 0 done
KeyEpicStatusAssignee
WT-7350 CDP - Initial InsiderOne In Progress Ken Harris
2
PM-222

Transport Growth & Efficiency Initiative (Marketplace)

Revenue Growth 🟢 Moving
On Track
🎯 Value
OKR
Outperform budget and create new EBITDA growth , Increase net recoverable for Buyer Transport from $78k p m (Oct 2025 baseline) to $200k pm by April 2026
Expected outcome
Increased revenue and efficiency gains for Transport team
🔄 Flow
In Progress Due 31 July 2026
45w
Running
26d
In stage
Large
Size
Squads
TransportPMOExperience Design
Product
MTMark Thorne
Eng
JSJerry Sun
🏥 Health
On Track
No blockers reported
Show work breakdown 11 active 15 done 29 total · 3 squads
Transport 25 epics · 11 active · 12 done
KeyEpicStatusAssignee
TRAN-6515 Transport Portal - Loadboard and Open Job Lifecycle In Progress Kelvin Gunawan
TRAN-6298 Marketplace: Buyer Transport In Progress
TRAN-6091 Search and Sort Jobs in Marketplace In Progress
TRAN-6087 Job Filters and Preferences Management In Progress
TRAN-6078 Supplier Portal Post-Cutover Issues and Changes In Progress
TRAN-5997 Marketplace - Buyer Transport In Progress
TRAN-5937 Marketplace - Admin user management In Progress
TRAN-5934 Marketplace - Search for Quotes In Progress
TRAN-5922 Marketplace - Geocoding In Progress
TRAN-5652 Transport Portal - Infra, Security and NFR requirements In Progress
TRAN-5427 Transport Portal - Job Details page In Progress Srikanth Kumar Palli
TRAN-5943 Define the Domain model for Quote function Not Started
TRAN-5558 NFR PAS Transport Not Started
TRAN-5967 Supplier Portal: Integrations Done
TRAN-5964 Supplier Portal: Job Status Done
TRAN-5956 Supplier Portal: Job Categories Done
TRAN-5960 Supplier Portal: View Job Details Done
TRAN-5955 Supplier Portal: Search Done
TRAN-5680 Transport Portal - Available Jobs [Transporter View] Done
TRAN-5674 Transport Portal - Ref data/ Config & Eligibility [Transport Admin] Done
TRAN-5426 Transport Portal - External Integration (PAS, Trengo) Done
TRAN-5425 Transport Portal - My Jobs Done Mani Vardhan Kasthuri
TRAN-5424 [Transporter] Transport Portal - Transporter Functions Done
TRAN-5423 Transport Portal - Authentication and Authorization Done Mani Vardhan Kasthuri
TRAN-5343 Transport Portal Tech Scaffolding Done
Experience Design 1 epic · 0 active · 0 done
KeyEpicStatusAssignee
XDX-585 PM-222 Transport Growth & Efficiency Initiative Not Started
PMO 3 epics · 0 active · 3 done
KeyEpicStatusAssignee
PM-428 Configurations/ Settings and Eligibility [Transport Admin] Done
PM-288 Non Functional requirements - Transport Portal Done
PM-287 Transport Portal - Okta role and permissions Done
3
PM-602

Pickles Pro - Phase 1 | Membership

Revenue Growth 🟢 Moving ⚡ Cross-Domain · 2 squads
No Data
🎯 Value
OKR
Deliver tech solutions to increase bidder engagement in end zone
Expected outcome
Modern technology stack that can evolve quickly to business needs
🔄 Flow
In Progress Due 27 Nov 2026
14d
Running
18d
In stage
Large
Size
Squads
WTAsset MgmtExperience Design
Product
ASAhmed Shuja
Eng
SGSriman Goshki
🏥 Health
No Data
RAG status not set
Show work breakdown 2 active 1 done 4 total · 3 squads
Asset Mgmt 1 epic · 1 active · 0 done
KeyEpicStatusAssignee
AM-12309 Pickles Pro In Progress
WT 2 epics · 1 active · 0 done
KeyEpicStatusAssignee
WT-7270 PicklesPro - Phase 1 In Progress Sandra Lucie
WT-6445 WT3 Pickles Pro Phase 1 PM-602 (conditional on Payment Gateway decision) Not Started
Experience Design 1 epic · 0 active · 1 done
KeyEpicStatusAssignee
XDX-1272 PM-602 Pickles Pro - Phase 1 Done Sol Yoo
3
PM-80

Cloud Cost Optimisation

Cost Reduction 🟢 Moving ⚡ Cross-Domain · 4 squads
On Track
🎯 Value
OKR
Do more with same or less - Cost saving of 2.5million by end June 2026
Expected outcome
600K Infra Recurring and 600K License Cost
🔄 Flow
In Progress Due 30 July 2026
2.3y
Running
X-Large
Size
Squads
Platform OpsVendor ESBPAIRSDevSecOps
Product
MOMichael Orefice
Eng
ASAnas Semesmieh
🏥 Health
On Track
No blockers reported
Show work breakdown 17 active 16 done 35 total · 4 squads
Vendor ESB 2 epics · 2 active · 0 done
KeyEpicStatusAssignee
ESB-5724 ESB - Complete Static Asset Migration to Cloudflare Edge (PAS - ESB Only) In Progress
ESB-5660 Cloud Cost Optimization (ESB Only) In Progress
Platform Ops 31 epics · 14 active · 15 done
KeyEpicStatusAssignee
POPS-2831 Azure Cost Optimization In Progress
POPS-2806 JAMF Decommission In Progress Daniel Kizana
POPS-2626 Complete Static Asset Migration to Cloudflare Edge (PAS/PAIRS) In Progress Oliver Bui
POPS-2453 Cloudflare Edge Image In Progress Oliver Bui
POPS-2008 Cosmos Cost Optimisation In Progress Aulia Fajri
POPS-2006 Azure DevOps Cost Optimisation In Progress Jeimansinggam Jeyasingam
POPS-1837 2025 UAT Right Sizing In Progress Anas Semesmieh
POPS-1833 2025 VM Cost Optimisation In Progress Geoffrey Sebastian
POPS-1832 2025 Storage Cost Optimisation In Progress Geoffrey Sebastian
POPS-1764 FinOps Project In Progress Oliver Bui
POPS-1373 Right-size Network and Infrastructure In Progress Geoffrey Sebastian
POPS-885 Right-size AKS Scale Sets In Progress Anas Semesmieh
POPS-2757 Complete Legacy Website CMS Migration (Kentico to Payload on Cloudflare) In Review Oliver Bui
POPS-2742 Cloudflare Edge Zone Standadization In Review Jeimansinggam Jeyasingam
POPS-2920 AMS Elasticsearch Consolidation Not Started Jeimansinggam Jeyasingam
POPS-1379 Licensing & Commercials Optimisation Not Started Melissa Watt
POPS-1834 2025 VM Horizon Review Done
POPS-1785 Cost Management Activities Done
POPS-1782 Time Tracking Done
POPS-1377 Convert App Services Done
POPS-1366 Azure Cost Optimisation - 2025 time tracking Done
POPS-1131 Log Analytics review and cleanup Done
POPS-1115 Azure Cost Optimisation PI4 Done
POPS-1061 Decommission Dormant Services Done Katrina Ramos
POPS-908 Right-size SQL Done Achim.Drescher
POPS-907 Reducing API/Event Processing - Phase 1 Done
POPS-906 Reducing API Calls - Phase 1 Done
POPS-899 Right-size Storage Done Oliver Bui
POPS-888 Right-size Virtual Machines Done Oliver Bui
POPS-887 Right-size App Services Done Anas Semesmieh
POPS-886 DM Environment Done Anas Semesmieh
PAIRS 1 epic · 1 active · 0 done
KeyEpicStatusAssignee
PAIRS20-6621 PAIRS Cost Optimisation In Progress
DevSecOps 1 epic · 0 active · 1 done
KeyEpicStatusAssignee
DOSE-7696 Cost optimization - Ops support Done Anas Semesmieh
4
PM-600

Website Content Management System - Replacement for Kentico

Revenue Growth 🟢 Moving
At Risk
🎯 Value
OKR
Deliver tech solutions to increase bidder engagement in end zone
Expected outcome
Modern technology stack that can evolve quickly to business needs
🔄 Flow
In Progress Due 10 July 2026
26w
Running
18d
In stage
X-Large
Size
Squads
WTExperience Design
Product
ASAhmed Shuja
Eng
SGSriman Goshki
🏥 Health
At Risk
Active risk
Scope
Show work breakdown 15 active 1 done 20 total · 2 squads
WT 16 epics · 15 active · 1 done
KeyEpicStatusAssignee
WT-7306 CMS-Blocks for Kentico Custom HTML In Progress Taiseen Halli
WT-7207 Payload CMS- Enquiry Forms In Progress Taiseen Halli
WT-7205 Payload CMS- Terms and Conditions In Progress Taiseen Halli
WT-7201 Tech -Applications calling Payload CMS API In Progress
WT-6690 Payload CMS & Next.js app - Foundational work In Progress Dinesh R
WT-6689 Vendor Pages In Progress Taiseen Halli
WT-6687 Homepage, Header, Footer and Navigation Menu In Progress Taiseen Halli
WT-6409 Fixed Price Checkout - Migration In Progress Pranjali Vishwas
WT-6378 Payload CMS - Page types &Page Templates In Progress Taiseen Halli
WT-6376 Payload CMS - Foundational content blocks In Progress Taiseen Halli
WT-7339 Migrate EOI PDF from Kentico to PAS Selling In Review Taiseen Halli
WT-7283 CMS-Payload & Pairs Integration In Review Taiseen Halli
WT-7192 CMS-add on Item details page In Review Taiseen Halli
WT-7175 Payload CMS- SEO and NFR In Review Chanka Dodampegamage
WT-6688 Content Migration - Sale details, Search titles etc In Review Taiseen Halli
WT-7202 Payload CMS- EOI Forms Done Taiseen Halli
Experience Design 4 epics · 0 active · 0 done
KeyEpicStatusAssignee
XDX-1292 CMS-Blocks for Kentico Custom HTML Not Started Sol Yoo
XDX-1240 PM-600 Payload CMS - Foundational content blocks Not Started Sol Yoo
XDX-1157 PM-600 Website Content Management System - Replacement for Kentico Not Started
XDX-1156 Website CMS Content Blocks Not Started

🐢 Slow Burn / Background 19
Not on the ranked bet list, but story/task activity shows real movement underneath — work we do when capacity allows
PM-693

Decommission Dell Boomi

Cost Reduction 🟢 Moving ⚡ Cross-Domain · 2 squads
No Data
🎯 Value
OKR
Outperform budget and create new EBITDA growth
Expected outcome
200K Boomi Licencing Cost Saving by 2027 - Migrate to Microservices
🔄 Flow
In Progress Due 30 Aug 2024
1.2y
Running
6w
In stage
X-Large
Size
Squads
Vendor ESBInspectionsPMO
Product
JKJinu Koshy
Eng
JSJerry Sun
🏥 Health
No Data
RAG status not set
Show work breakdown 5 active 0 done 8 total · 3 squads
Vendor ESB 6 epics · 5 active · 0 done
KeyEpicStatusAssignee
ESB-5710 Move Autocheck Inspections Off BOOMI In Progress
ESB-5663 BOOMI: Move Autogate Off BOOMI In Progress
ESB-4963 BOOMI: Reusable API for Transport Requests for Vendors In Progress
ESB-4188 BOOMI: Move Rego Refunds Off Dell Boomi In Progress Philippa Gallagher
ESB-5585 BOOMI: Move Advanced Notifications Off Boomi In Review
ESB-5672 BOOMI: Shut down old Processes Not Started
Inspections 1 epic · 0 active · 0 done
KeyEpicStatusAssignee
IN-1871 Placeholder to support decommissioning dell boomi AC integration db for transactional data Not Started
PMO 1 epic · 0 active · 0 done
KeyEpicStatusAssignee
PM-720 Move Autogate Off BOOMI Not Started
PM-553

IAG AssessVal Integration

Revenue Growth 🟢 Moving
No Data
🎯 Value
OKR
Not applicable
Expected outcome
More cars to Pickles. Easier for IAG to get 1$ value for the Salvage Estimate, increase likelihood to Write Assets Off - send more to Pickles.
🔄 Flow
In Progress Due 30 June 2026
32w
Running
6w
In stage
Medium
Size
Squads
Vendor ESB
Product
JVJayesh Vanmali
Eng
JSJerry Sun
🏥 Health
No Data
RAG status not set
Show work breakdown 1 active 0 done 1 total · 1 squad
Vendor ESB 1 epic · 1 active · 0 done
KeyEpicStatusAssignee
ESB-5231 IAG AssessVal Integration In Progress
PM-753

PICKLES DIRECT APP - Post MVP

Revenue Growth 🟢 Moving
No Data
🎯 Value
OKR
Create new EBITDA Growth​
Expected outcome
Demonstrate incremental growth - Increase sales and process efficiency
🔄 Flow
In Progress
17d
Running
18d
In stage
X-Large
Size
Squads
Pickles Direct
Product
TGTom Gooday
Eng
ACAdrian Chew Kah Hoong
🏥 Health
No Data
No blockers reported
RAG status not set
Show work breakdown 0 active 0 done 8 total · 1 squad
Pickles Direct 8 epics · 0 active · 0 done
KeyEpicStatusAssignee
PD-8 PD - Security, Quality, Release, and Handover Not Started Jinu Koshy
PD-7 PD - Notifications, Onboarding, and Help Not Started Jinu Koshy
PD-6 PD - Submission Lifecycle and Valuation Decisions Not Started Jinu Koshy
PD-5 PD - Offline Persistence and Sync Engine Not Started Jinu Koshy
PD-4 PD - Photo and Media Capture Experience Not Started Jinu Koshy
PD-3 PD - Schema-Driven Asset Capture Not Started Jinu Koshy
PD-2 PD - Authentication and Vendor Account Management Not Started Jinu Koshy
PD-1 PD - Foundation, Environments, and Delivery Controls Not Started Jinu Koshy
PM-574

Build New Sale Info, Saved Search, Sale Template Chat Bot, Invoice page

Revenue Growth 🟢 Moving ⚡ Cross-Domain · 3 squads
No Data
🎯 Value
OKR
Deliver tech solutions to increase bidder engagement in end zone
Expected outcome
Modern technology stack that can evolve quickly to business needs
🔄 Flow
In Progress Due 30 June 2026
10w
Running
4w
In stage
Large
Size
Squads
WTExperience DesignFinance D365Sale Mgmt
Product
ASAhmed Shuja
Eng
SGSriman Goshki
🏥 Health
No Data
RAG status not set
Show work breakdown 4 active 8 done 13 total · 4 squads
Finance D365 1 epic · 1 active · 0 done
KeyEpicStatusAssignee
FIN-11282 Buyer Invoice Improvements - D365 In Progress
WT 9 epics · 3 active · 6 done
KeyEpicStatusAssignee
WT-5988 Buyer Agent V1 (Chat) In Progress Mazharul Anwar
WT-5741 web24- Enhance Buyer Invoices In Progress Naalera Yaacob
WT-6388 WAP and Liferay Shutdown In Review Sriman Goshki
WT-6474 Cloudinary to Cloudflare Cutover | Website | IMS Done Sriman Goshki
WT-6405 Sale Info/Details Page Migration to New Website [ Independent to Sale Template] Done Taiseen Halli
WT-6327 Website Phase 3 Discovery and Analysis Done Pranjali Vishwas
WT-6211 Onboard website and buyer/website repositories for AI first development Done Jishnu Purath
WT-6208 Saved Search - Migration and Enhancements Done Pranjali Vishwas
WT-6017 Sale Template migration to PAS Done Pranjali Vishwas
Experience Design 2 epics · 0 active · 1 done
KeyEpicStatusAssignee
XDX-1019 PM-574 Phase 3 - Website Transformation - Placeholder Not Started
XDX-1080 PicklesBot Phase 1: FAQ Answerbot Done
Sale Mgmt 1 epic · 0 active · 1 done
KeyEpicStatusAssignee
SAL-9852 Sale Template Maintenance Done Sandra Lucie
PM-29

Cloud Maturity & Improvement

Efficiency Gains 🟢 Moving
No Data
🎯 Value
OKR
Not applicable
Expected outcome
Consistent and Standardized processes and policy enforcement will help streamline resource utilization, reduce security risks, and improved cost management.
🔄 Flow
In Progress Due 31 Dec 2026
2.2y
Running
X-Large
Size
Squads
Platform OpsPMO
Product
MOMichael Orefice
Eng
ASAnas Semesmieh
🏥 Health
No Data
RAG status not set
Show work breakdown 10 active 4 done 15 total · 2 squads
Platform Ops 14 epics · 10 active · 3 done
KeyEpicStatusAssignee
POPS-2918 RTN-ANZ / Buyer Invoice In Progress Jeimansinggam Jeyasingam
POPS-2671 NX Monorepo Migration In Progress
POPS-1513 IAC Enablement and Modernisation In Progress Jeimansinggam Jeyasingam
POPS-1506 Developer Experience & Automation (IDP) In Progress Jeimansinggam Jeyasingam
POPS-1505 GitOps: Automation Highway Enablement In Progress Jeimansinggam Jeyasingam
POPS-1492 CMDB Enhancement In Progress Daniel Kizana
POPS-1435 GitOps Cloud Framework taskforce In Progress Nick Jones
POPS-1213 Follow-on Tasks from Rackspace Decommission In Progress Geoffrey Sebastian
POPS-2961 DigiCert Retirement In Review Anas Semesmieh
POPS-2919 Website redirect IAC development In Review Jeimansinggam Jeyasingam
POPS-2162 Rollout Centralised Print Solution Not Started Jack Whelan
POPS-1324 IAC Improvement and Maturity Done
POPS-1272 CAF / FinOps Alignment Done Oliver Bui
POPS-1262 Supplier Governance and Upskilling Done
PMO 1 epic · 0 active · 1 done
KeyEpicStatusAssignee
PM-584 Cloudflare Images Done Oliver Bui
PM-601

MyPickles - Reconstruction in New Website

Revenue Growth 🟢 Moving
No Data
🎯 Value
OKR
Deliver tech solutions to increase bidder engagement in end zone
Expected outcome
Modern technology stack that can evolve quickly to business needs
🔄 Flow
In Progress
1.2y
Running
18d
In stage
X-Large
Size
Squads
WTExperience Design
Product
ASAhmed Shuja
Eng
SGSriman Goshki
🏥 Health
No Data
RAG status not set
Show work breakdown 3 active 4 done 18 total · 2 squads
WT 15 epics · 3 active · 1 done
KeyEpicStatusAssignee
WT-7035 Phase 3 3rd Party ID Verification - Equifax replacement |UX In Progress Louise McGrath
WT-6396 Sign-up Web Account In Progress Ken Harris
WT-6397 MyPickles - Individual Buyer Account In Review Pranjali Vishwas
WT-7442 CRM Integrations Not Started
WT-7293 MyPickles - Discovery and Impact Analysis Not Started Jithu Jose
WT-7084 On-demand Sign-Ins Not Started Ahmed Shuja
WT-7083 Social Media Sign-ups Not Started Ahmed Shuja
WT-7082 ??? Profile Management Not Started Ahmed Shuja
WT-7081 MyPickles Payment Method Not Started Ahmed Shuja
WT-7080 Auto–Id Verification Not Started Ahmed Shuja
WT-6447 WT3 Web to 1-CRM Integration (second phase of 1 CRM integration) Not Started Sandra Lucie
WT-6400 web24 User Access Management Not Started Ahmed Shuja
WT-6399 MyPickles Dashboard - Links Not Started Ahmed Shuja
WT-6398 Manual-Id Verification Not Started Ahmed Shuja
WT-6419 My Purchases - Won item page enhancements Done
Experience Design 3 epics · 0 active · 3 done
KeyEpicStatusAssignee
XDX-1261 MyPickles - Individual Buyer Account Done Sol Yoo
XDX-1089 PM-601 MyPickles Platform Migration & User Management Done
XDX-450 PM-601 MyPickles - Reconstruction in New Website Done
PM-551

Industrial Inspection changes

Efficiency Gains 🟢 Moving
No Data
🎯 Value
OKR
Do more with same or less -Create 2500 days of capacity by Q3, Create 2500 days of capacity by Q3
Expected outcome
1500 minimum capacity days, increase sale value of assets, reduce losses
🔄 Flow
In Progress Due 30 Apr 2026
23w
Running
18d
In stage
Medium
Size
Squads
InspectionsExperience Design
Product
LPLucinda Pagett
Eng
ACAdrian Chew Kah Hoong
🏥 Health
No Data
RAG status not set
Show work breakdown 3 active 1 done 13 total · 2 squads
Inspections 10 epics · 3 active · 0 done
KeyEpicStatusAssignee
IN-1697 Industrial - Trailer inspections Upgrade In Progress
IN-108 Industrial - Earthmoving equipment, capture, display and relationships In Progress Divya Kannan
IN-107 Industrial - Truck inspection upgrade In Progress Divya Kannan
IN-1873 Book to Book copy enhancements Not Started
IN-1860 [AC-Config] New best practice inspection creations Not Started
IN-1859 Establish new body type relationships for Earthmoving asset type Not Started
IN-1862 Website - Industrial new fields introduction co-ordination Not Started
IN-1823 Motorcycle new best practices Not Started
IN-1814 Caravan Inspection upgrade Not Started
IN-1698 General goods - New inspection capability Not Started
Experience Design 3 epics · 0 active · 1 done
KeyEpicStatusAssignee
XDX-953 PM-551 Inspections Not Started
XDX-293 PM-551 Autocheck enhancement Not Started
XDX-775 PM-551 Add and remove damage for different vendors and inspections - all in one screen Done
PM-562

PayTo - Phase 1: Fileactive integration, RTN & Account Payable

Efficiency Gains 🟢 Moving
At Risk
🎯 Value
OKR
Do more with same or less
Expected outcome
Approx 650 workdays saved per year across Finance and Operations, by reducing manual payment handling and follow‑ups. Payable automation, saving approx 20 hours per week. Improved DIN for faster turnaround and overall customer satisfaction.
🔄 Flow
In Progress Due 30 June 2026
23w
Running
18d
In stage
Medium
Size
Squads
Finance D365
Product
BLBreanna Liddell
Eng
ACAdrian Chew Kah Hoong
🏥 Health
At Risk
Active risk
Deprioritized
Show work breakdown 2 active 0 done 3 total · 1 squad
Finance D365 3 epics · 2 active · 0 done
KeyEpicStatusAssignee
FIN-11329 Phase 1.2 API Real Time Notification (RTN) for Inward OSKO transaction In Progress Jessica Leow
FIN-11068 Phase 1.1 FileActive integration for CAMT statements using SFTP In Progress Jessica Leow
FIN-11330 Phase 1.3 (For Accounts Payables) Automatically upload files (ISO20022) to ANZ - approvals within D365 Not Started
PM-30

Service Management Improvement

Efficiency Gains 🟢 Moving
No Data
🎯 Value
OKR
Not applicable
Expected outcome
Modernize ITSM by aligning infrastructure architecture and governance to CSDM
🔄 Flow
In Progress Due 20 May 2025
2.4y
Running
Large
Size
Squads
Platform OpsPMO
Product
MOMichael Orefice
Eng
DKDaniel Kizana
🏥 Health
No Data
RAG status not set
Show work breakdown 1 active 8 done 12 total · 2 squads
Platform Ops 8 epics · 1 active · 6 done
KeyEpicStatusAssignee
POPS-1333 Tool Adoption and Improvement In Progress Daniel Kizana
POPS-1509 SLIs, SLOs, SLAs - Dashboards Not Started Aulia Fajri
POPS-1926 Zoom to Teams: Handover to Support Done Daniel Kizana
POPS-1925 Zoom to Teams: Service Management Done Daniel Kizana
POPS-1924 Zoom to Teams: Migration of Meeting Rooms Done Daniel Kizana
POPS-1923 Zoom to Teams: Migration of Meetings Done Daniel Kizana
POPS-1922 Zoom to Teams: Migration of Phones Done Daniel Kizana
POPS-1921 Supplier agreements and provisioning Done Melissa Watt
PMO 4 epics · 0 active · 2 done
KeyEpicStatusAssignee
PM-480 SD On-Site Tasks Not Started
PM-479 SD Equipment Builds Not Started
PM-582 Service Management Planning Done Daniel Kizana
PM-108 System Improvement Integration and Automation Done Daniel Kizana
PM-31

Cyber Security Improvement

Risk Mitigation 🟢 Moving ⚡ Cross-Domain · 4 squads
No Data
🎯 Value
OKR
Not applicable
Expected outcome
Strengthen IT Ops security and resilience
🔄 Flow
In Progress Due 31 Dec 2026
1.4y
Running
X-Large
Size
Squads
Platform OpsCore PlatformPAIRSDevSecOpsPMO
Product
MOMichael Orefice
Eng
ATAlex Teseo
🏥 Health
No Data
RAG status not set
Show work breakdown 14 active 9 done 32 total · 5 squads
Platform Ops 28 epics · 13 active · 6 done
KeyEpicStatusAssignee
POPS-2344 FastPass pilot – Okta Verify stage In Progress Vikas Ghule
POPS-2132 Cyber Security Improvements In Progress Geoffrey Sebastian
POPS-1432 Configure and Enforce Mobile Device Management (MDM) (R16) In Progress Alex Teseo
POPS-1431 Technologies & tools for secure SDLC (R11) In Progress Alex Teseo
POPS-1427 Cross-division collaboration through Working Groups, Cyber Reporting (R1) In Progress Alex Teseo
POPS-1424 Operating System and Application Patch Management Workflows (R14) In Progress Alex Teseo
POPS-1414 ISO 27001, PCI DSS and NIST CSF Alignment (R9) In Progress Alex Teseo
POPS-1269 Identity and Access Management In Progress Oliver Bui
POPS-2315 Cloudflare Edge Enterprise Bot Management In Review Alex Teseo
POPS-1433 Implement privileged access management solution (R12) In Review Alex Teseo
POPS-1428 Structured Internal communications and simulation exercises (R2) In Review Alex Teseo
POPS-1425 Enforce Conditional Access for Corporate Email and Data Access (R17) In Review Alex Teseo
POPS-1416 Catalogue, document critical asset, information and systems (R18) In Review Alex Teseo
POPS-1430 Implement Third Party Risk Management (R19) Not Started Alex Teseo
POPS-1426 Secure password management for systems without SSO+MFA integration. (R7) Not Started Alex Teseo
POPS-1423 DLP to prevent sensitive information leakage outside a corporate network. (R8) Not Started Alex Teseo
POPS-1422 Integrating security testing into the SDLC via governance processes and workflows. (R3) Not Started Alex Teseo
POPS-1421 Data classification by sensitivity and value to ensure proper security and compliance. (R4) Not Started Alex Teseo
POPS-1420 Passwordless Experience (R15) Not Started Alex Teseo
POPS-1419 Data Discovery & Classification Tool Implementation (R10) Not Started Alex Teseo
POPS-1417 Automated User Access Reviews (R13) via OKTA Not Started Alex Teseo
POPS-1336 ServiceNow Security Review Not Started Daniel Kizana
POPS-1429 Schedule Ongoing Security Audits and Penetration Tests (R6) Done Alex Teseo
POPS-1418 Security Tooling Implementation Done Alex Teseo
POPS-1415 Cyber Security Strategy (R5) Done Alex Teseo
POPS-1277 PCI Compliance Done Alex Teseo
POPS-949 Need to urgently integrate Qualys with our Jira for vulnerability management Done Alex Teseo
POPS-930 Enforce 2FA Authentication for TeamViewer Admins Done Alex Teseo
PAIRS 1 epic · 1 active · 0 done
KeyEpicStatusAssignee
PAIRS20-7342 Enable MFA for PAIRS In Progress
Core Platform 1 epic · 0 active · 1 done
KeyEpicStatusAssignee
CAF-4427 Security Vulnerabilities -CAF Support Done Rohini Rao
DevSecOps 1 epic · 0 active · 1 done
KeyEpicStatusAssignee
DOSE-7999 Adhoc |Security vulnerability management Done Anas Semesmieh
PMO 1 epic · 0 active · 1 done
KeyEpicStatusAssignee
PM-123 Enforce 2FA Authentication for TeamViewer Admins Done Alex Teseo
PM-740

Inspection Information Between Inspections

Efficiency Gains 🟢 Moving
No Data
🎯 Value
OKR
Do more with same or less
Expected outcome
Consistent inspections - less rework
🔄 Flow
In Progress Due 31 Dec 2026
10d
Running
18d
In stage
Medium
Size
Squads
Inspections
Product
LPLucinda Pagett
Eng
ACAdrian Chew Kah Hoong
🏥 Health
No Data
RAG status not set
Show work breakdown 1 active 0 done 1 total · 1 squad
Inspections 1 epic · 1 active · 0 done
KeyEpicStatusAssignee
IN-1867 Post MVP additions to Sale Photo inspections In Progress
PM-28

EuC / Collaboration - Modern workplace

Efficiency Gains 🟢 Moving ⚡ Cross-Domain · 2 squads
No Data
🎯 Value
OKR
Not applicable
Expected outcome
Modern workplace transformation will result in a increased productivity, seamless communication and collaboration, drive a culture of innovation, and an overall better employee experience.
🔄 Flow
In Progress Due 31 Dec 2026
2.0y
Running
Large
Size
Squads
Platform OpsVendor ESB
Product
MOMichael Orefice
Eng
JWJack Whelan
🏥 Health
No Data
RAG status not set
Show work breakdown 5 active 5 done 10 total · 2 squads
Platform Ops 9 epics · 4 active · 5 done
KeyEpicStatusAssignee
POPS-2811 NEW 25H2 Rollout In Progress Daniel Kizana
POPS-2680 Slack Integration and Migration to Teams In Progress Daniel Kizana
POPS-1510 Endpoint Deployment automation - Autopilot In Progress Vikas Ghule
POPS-1252 Identity Management In Progress Aidan Alvarez
POPS-2603 POPS Tasks for One CRM Done
POPS-1281 End-user Compute Done Geoffrey Sebastian
POPS-1259 Fleet Modernisation Done Geoffrey Sebastian
POPS-1258 GPO Setup Done
POPS-1254 Mobile Device Management (MDM) Improvements Done
Vendor ESB 1 epic · 1 active · 0 done
KeyEpicStatusAssignee
ESB-5661 (Move Off Slack) EuC / Collaboration - Modern workplace In Progress
PM-179

IT OPS Real Estate Initiatives and Acquisitions

Efficiency Gains 🟢 Moving
No Data
🎯 Value
OKR
Not applicable
Expected outcome
Enabled secure, scalable IT Ops support for real estate initiatives and acquisitions through standardized platforms, improved operational readiness, and seamless integration of new sites.
🔄 Flow
In Progress Due 12 Nov 2026
1.4y
Running
6w
In stage
Medium
Size
Squads
Platform Ops
Product
MOMichael Orefice
Eng
DKDaniel Kizana
🏥 Health
No Data
RAG status not set
Show work breakdown 2 active 2 done 4 total · 1 squad
Platform Ops 4 epics · 2 active · 2 done
KeyEpicStatusAssignee
POPS-2824 IT OPS New Office/Branch Setup In Progress Jack Whelan
POPS-1133 JEAL Onboarding In Progress Daniel Kizana
POPS-1249 JEAL Integration to Pickles Digital ecosystem Done
POPS-1148 Malaysia Office Move Done
PM-636

Work Management - Asset Appointments

Efficiency Gains 🟢 Moving ⚡ Cross-Domain · 3 squads
On Track
🎯 Value
OKR
Do more with same or less - Create 2500 days of capacity by Q3
Expected outcome
Saving of 600 days a year
🔄 Flow
In Progress Due 30 Sept 2026
14w
Running
18d
In stage
Medium
Size
Squads
Vendor ESBExperience DesignPAIRSAsset Mgmt
Product
NCNicole Charlwood
Eng
ACAdrian Chew Kah Hoong
🏥 Health
On Track
Show work breakdown 3 active 0 done 4 total · 4 squads
Asset Mgmt 1 epic · 1 active · 0 done
KeyEpicStatusAssignee
AM-12204 Asset Appointment In Progress Linda Fong
Vendor ESB 1 epic · 1 active · 0 done
KeyEpicStatusAssignee
ESB-5691 (ESB) - Asset Appointments - Vendor Request In Review
PAIRS 1 epic · 1 active · 0 done
KeyEpicStatusAssignee
PAIRS20-7653 [Vendor] PLACEHOLDER Work Mgt - Asset Appointments In Review
Experience Design 1 epic · 0 active · 0 done
KeyEpicStatusAssignee
XDX-1190 PM-636 Work Management - Asset Appointments Not Started Nasfath Rahman
PM-748

Decommission WAP & Liferay

🟡 Ticking
No Data
🎯 Value
No outcome data
🔄 Flow
In Review
6w
Running
17d
In stage
X-Large
Size
Squads
WT
Product
ASAnas Semesmieh
Eng
SGSriman Goshki
🏥 Health
No Data
RAG status not set
Show work breakdown 3 active 0 done 3 total · 1 squad
WT 3 epics · 3 active · 0 done
KeyEpicStatusAssignee
WT-7215 Liferay Decommission / Transition support - Discovery and Analysis In Progress
WT-7390 WAP Decommissioning - Migration to new website In Review
WT-6829 WAP decommissioning - Impact on the new website components In Review Sriman Goshki
PM-623

Digital Gatepasses

Efficiency Gains 🟡 Ticking
No Data
🎯 Value
OKR
Do more with same or less - Create 2500 days of capacity by Q3
Expected outcome
Saving of 991 working days per annum
🔄 Flow
In Progress Due 15 May 2026
8w
Running
19d
In stage
Medium
Size
Squads
Experience DesignAsset Mgmt
Product
LGLorraine Gilfether
Eng
ACAdrian Chew Kah Hoong
🏥 Health
No Data
RAG status not set
Show work breakdown 1 active 0 done 2 total · 2 squads
Asset Mgmt 1 epic · 1 active · 0 done
KeyEpicStatusAssignee
AM-12200 Digital Gatepasses In Progress
Experience Design 1 epic · 0 active · 0 done
KeyEpicStatusAssignee
XDX-1152 PM-623 Digital Gatepasses Not Started
PM-626

E-Salvage Process Review

Revenue Growth 🟡 Ticking
No Data
🎯 Value
OKR
Chet/Robbo to confirm
Expected outcome
Improve efficiency, allow Salvage to Scale
🔄 Flow
In Review
23w
Running
7w
In stage
Large
Size
Squads
PMOAsset Mgmt
Product
JRJenny Ricciardiello
Eng
MAMazharul Anwar
🏥 Health
No Data
RAG status not set
Show work breakdown 2 active 0 done 3 total · 2 squads
Asset Mgmt 1 epic · 1 active · 0 done
KeyEpicStatusAssignee
AM-12268 E-salvage Process Review In Review
PMO 2 epics · 1 active · 0 done
KeyEpicStatusAssignee
PM-632 E-Salvage Business Process Redesign In Review
PM-633 E-Salvage Tech Review and Solution Design Not Started
PM-606

Marketing Efficiency & Automation

Revenue Growth 🟡 Ticking
No Data
🎯 Value
OKR
Deliver tech solutions to increase bidder engagement in end zone
Expected outcome
Modern technology stack that can evolve quickly to business needs
🔄 Flow
Not Started
7w
Running
19d
In stage
Large
Size
Squads
WT
Product
ASAhmed Shuja
Eng
SGSriman Goshki
🏥 Health
No Data
RAG status not set
Show work breakdown 2 active 0 done 2 total · 1 squad
WT 2 epics · 2 active · 0 done
KeyEpicStatusAssignee
WT-7333 Automation Tasks | SRE | TOIL In Progress
WT-6381 Payload CMS - Marketing Automation In Review
PM-16

Statutory Forms Update Priority 1 [Recurring]

Compliance 🟡 Ticking
No Data
🎯 Value
OKR
Not applicable
Expected outcome
Compliance with Statutory requirements and will allow us to automate forms on website and reduce manual handling.
🔄 Flow
In Progress Due 26 June 2026
32w
Running
Squads
Sale Mgmt
Product
LMLouise McGrath
Eng
AYAjeet Yelandur
🏥 Health
No Data
RAG status not set
Show work breakdown 2 active 1 done 3 total · 1 squad
Sale Mgmt 3 epics · 2 active · 1 done
KeyEpicStatusAssignee
SAL-9441 Stat Form Business Rules Updates (25Q3, 25Q4 & 26Q1 ONLY) In Progress Simon Chambers
SAL-8940 PAS Automatic Emailing of Post Sale Statutory Forms to Buyer (Phase 2) In Progress
SAL-8943 Post Sale Fulfillment and Stat Form Automation - Additional work (Phase 3) Done Sandra Lucie

💤 Not This Quarter / Stalled 13
Unranked and no recent story-level activity — either deprioritised or quietly drifting
Show 13 parked initiatives
PM-776
AI Inspections
❓ No work 0 stories · freshest update never
↳ Slow burning when we have capacity
PM-760
E-Salvage Fee Recovery
❓ No work 0 stories · freshest update never
PM-767
Earthmoving Inspections
❓ No work 0 stories · freshest update never
↳ Slow burning when we have capacity
PM-607
Email - Modernise email infrastructure
❓ No work 0 stories · freshest update 164d ago
Revisit: 2026-07-01
PM-766
General Goods Inspections
❓ No work 0 stories · freshest update never
↳ Slow burning when we have capacity
PM-457
Industrial In Situ Selling
❓ No work 0 stories · freshest update 59d ago
↳ Slow burning when we have capacity
Revisit: 2026-07-01
PM-603
Invoice payment with cards
🛑 Stalled 1 stories · freshest update 66d ago
Revisit: 2026-07-01
PM-774
New Motor Vehicle Sale Photo Inspections - MVP
❓ No work 0 stories · freshest update never
↳ Slow burning when we have capacity
PM-772
New Salvage Vehicle Sale Photo Inspections - MVP
❓ No work 0 stories · freshest update never
↳ Slow burning when we have capacity
PM-731
PayTo - Phase 2: Receivables via Straight through Processing
❓ No work 0 stories · freshest update 58d ago
Revisit: 2026-07-01
PM-732
PayTo - Phase 3: ISO Formatting
❓ No work 0 stories · freshest update 58d ago
Revisit: 2026-08-03
PM-770
Trailer Inspections
❓ No work 0 stories · freshest update never
↳ Slow burning when we have capacity
PM-768
Truck Inspections
❓ No work 0 stories · freshest update never
↳ Slow burning when we have capacity